• ABOUT US
  • CAPABILITIES
  • OUR PROJECTS
  • OUR TEAM
  • CONTACT US
  • More
    • ABOUT US
    • CAPABILITIES
    • OUR PROJECTS
    • OUR TEAM
    • CONTACT US
  • ABOUT US
  • CAPABILITIES
  • OUR PROJECTS
  • OUR TEAM
  • CONTACT US

Quilpie Sewage Treatment Plant Upgrade

Overview

Projection Duration - FEB 2024 - PRESENT

Ferrier Engineering assisted from concept through to detailed design a new sewage treatment plant for the town of Quilpie. The plant would replace the existing plant currently in place and reuse the lagoons as part of the treatment process.


The new treatment plant is to be installed within a new 40 x 12m shed, which houses all the main treatment equipment.

Plant Features

  • New treatment facility with new 12 x 40m shed
  • New stainless steel inletworks
  • New rotating biological contactors 
  • New stainless steel clarifiers
  • New chemical dosing system for Sodium Hypochlorite and Ferric Sulphate

Responsibilities

  • 3D laser scanning of existing site conditions and geometry for placement of new treatment facility
  • Development of detailed design and fabrication drawings for the project
  • Mechanical and structural design for pipework, supports and other ancillary equipment
  • Structural design of treatment facility shed, stainless steel IDEA tanks and associated platforms
  • Hydraulic design of the system, including specification of pumping systems. 

  • ABOUT US
  • CAPABILITIES
  • OUR PROJECTS
  • OUR TEAM
  • CONTACT US

FERRIER ENGINEERING

L9 / 410 Queen Street, Brisbane City Queensland 4000, Australia

Andrew Ferrier - 0499 016 612

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept