Design and Drafting of 11,000L Pressure Vessel

Client: BDR Stainless Project: Design and Detailed Drafting of 11,000 L Pressure Vessel Date: 10/2016             Time to Completion: 3 week Deliverables: Detailed fabrication drawing packs for the vessel, including .DWGs for laser cutting of all structural plates and the dimpled cooling jacket. Design certificate signed by Registered Professional Engineer of Queensland[…]