RPEQ Design and Drafting of Animal Feed Plant Access System

Client: Downfields Engineering

Project: RPEQ Design and Drafting of Extensive Access System for Animal Food Plant

Date: 22/10/2015                    Time to Completion: 3 weeks

Deliverables: Mechanical drawing pack. .DWG and .DXF files were supplied for laser cutting of components

Description:  Downfields Engineering provide equipment and solutions for the reliable handling and storage of granular products. Downfields Engineering’s client required a new access system to simplify and improve plant access for operational and maintenance activities. 

 Ferrier Engineering attended the site with Downfields Engineering and performed an extensive site measure. The platforms were checked in accordance with Australian Standards using structural modelling software. All platforms were then modelled and drafted. Parts-List spreadsheets for each assembly were supplied to Downfields Engineering to assist with ordering of material.

Downfields Townsville Platform

Platform General Arrangement Drawing