Elevated Reservoir Telecommunications Support Structure

Client: Pensar Infrastructure

Project: Elevated Reservoir Telecommunication Support Structure

Date: 10/2018             Time to Completion:  5 Months

Project Description: Ferrier Engineering was engaged by Pensar to design a new support structure and associated access and handrail structures for telecommunication equipment on the roof of an elevated water reservoir in South Brisbane.

Scope of Works:

  • Perform a comprehensive 3D scan / survey of the existing reservoir.
  • Produce design drawings for the support structure incorporating fall-arrest anchorages in accordance with AS/NZS1891 for safe access into the reservoir.
  • Produce design and fabrication drawings for the reservoir perimeter handrail.
  • Produce Design and fabrication drawings for the associated electrically actuated reservoir access hatches, walkways and platforms fixed to the new roof sheeting.