Design and Drafting of Reservoir Stormwater System

Client: Metal Maintenance

Project: Design and Drafting of 50m Reservoir Stormwater System

Date: 02/2016             Time to Completion: 6 weeks

Deliverables:

  • Fabrication drawing pack, delivered in PDF format.
  • Profiles for laser cutting where required, delivered in .DWG format .
  • Design certificate signed by Registered Professional Engineer of Queensland (RPEQ).

Description: Ferrier Engineering was engaged by Metal Maintenance to develop a solution for removing rainwater from the base of two 50 diameter reservoirs (to prevent settlement). Ferrier Engineering conducted an extensive site measure, developed concepts, checked the hydraulic capacity of the system to AS/NZS3500.3 and prepared detailed fabrication drawings.

The solution took advantage of the existing structure and minimised the extent of site-works.

Sample Stormwater System Detail

Sample Stormwater System Detail