Client: BDR Stainless
Project: Design and Drafting of Pipework for Warwick WTP
Date: 08/2017 Time to Completion: 5 weeks
Deliverables:
- Laser scan data of pipework about the Clarifier tanks
- Detailed fabrication drawing packs, with RPEQ certification, for all pipe spools.
Description: Ferrier Engineering was engaged by BDR Stainless to complete detailed design and drafting of pipework required for an upgrade of the Warwick WTP. Ferrier Engineering completed a laser scan / survey of the site, which allowed for highly accurate modelling of all spools and a reduction in site-welding and fit-up, resulting in a cost-saving to the client.

Custom Pipe Spool Overlayed on Laser Scan Data