Design and Drafting of Pipework for Warwick WTP

Client: BDR Stainless

Project: Design and Drafting of Pipework for Warwick WTP

Date: 08/2017             Time to Completion:  5 weeks

Deliverables:

  • Laser scan data of pipework about the Clarifier tanks
  • Detailed fabrication drawing packs, with RPEQ certification, for all pipe spools.

Description: Ferrier Engineering was engaged by BDR Stainless to complete detailed design and drafting of pipework required for an upgrade of the Warwick WTP. Ferrier Engineering completed a laser scan / survey of the site, which allowed for highly accurate modelling of all spools and a reduction in site-welding and fit-up, resulting in a cost-saving to the client.

Custom Pipe Spool Overlayed on Laser Scan Data