Design of PE Pipe and Hydrant Valve Installation

Client: Metal Maintenance Project: Design of a PE pipe run and hydrant valve installation in a Gold Coast Water Treatment Plant (WTP) Pump Room Date: 08/2018             Time to Completion:  3 weeks Deliverables: General arrangement drawings for pipe run enabling the installation of a hydrant valve external to a pump rump. Supply[…]

Design and Drafting of 11,000L Pressure Vessel

Client: BDR Stainless Project: Design and Detailed Drafting of 11,000 L Pressure Vessel Date: 10/2016             Time to Completion: 3 week Deliverables: Detailed fabrication drawing packs for the vessel, including .DWGs for laser cutting of all structural plates and the dimpled cooling jacket. Design certificate signed by Registered Professional Engineer of Queensland[…]

Design and Drafting of 1500 kPa Air Receiver

Client: Fleming’s Welding Service Project: Design and Drafting of 1500 kPa Air Receiver Date: 09/2016             Time to Completion: 3 week Deliverables: Detailed fabrication drawing packs for the vessel, including .DWGs for laser cutting of all structural plates. Supply of etched aluminium vessel data plates. Signed Form 14 (Application for registration of plant[…]

Design and Drafting for Installation of WTP Isolation Valves

Client: Metal Maintenance Project: Installation of Isolation Valves in Water Treatment Plant Date: 07/2016             Time to Completion: 6 weeks Deliverables: Detailed fabrication drawing packs for all pipe spools and supply of general arrangement and installation drawings for 6 valve locations. Calculation of thrust restraint required at valves to resist hydrostatic pressure. Specification[…]

Ducting Pressure Loss Calculations for Nestle

Client: Nestle Project: Ducting Pressure Losses Date: 30/09/2015                  Time to Completion: 2 weeks Deliverables: Hand calculations ‘setting up’ pressure loss equations, spreadsheet summation of all pressure losses Description: Ferrier Engineering completed pressure loss calculations for two large ducting runs to allow correct sizing of fans. The Ducting consisted of 700 and 900[…]

Mechanical Drafting of High Pressure Duplex Stainless Pipe Spools

Client: Metal Maintenance Project: Mechanical Drafting of High Pressure Duplex Stainless Pipe Spools Date: 22/09/2015                    Time to Completion: 1 week Deliverables: Fabrication drawings for 20 high pressure Duplex stainless steel pipe spools Description: Ferrier Engineering recently completed the drafting of 20 separate high pressure Duplex stainless steel pipe[…]