Reservoir Drone Photogrammetry Model

Project: Generation of 3D model of Reservoir complex via drone photogrammety. Date:  04/2019             Time to Completion: 2 Days Deliverables: Supply of .rcp, .rcm and .obj file types to allow direct inspection and interrogation of the reservoir complex 3D model. Description: Ferrier Engineering was engaged to generate a 3D model of[…]

Drone Inspection of Crane Rails

Client: Brisbane Manufacturer Project: Drone Inspection of Crane Rails for 10 tonne Crane Date: 02/2019           Project Description: Ferrier Engineering was engaged by a large manufacturer in Brisbane to visually inspect crane rails for significant misaligment, missing fasteners and debris on the rail and mounting beam. The particular location of the crane[…]

Access Structures for Western QLD Gas Facility

Client: Rayham Engineering Project: Design and Drafting of Access Structures Date: 02/2019             Time to Completion:  3 Weeks Project Description: Ferrier Engineering was engaged by Rayham Engineering to provide design and detailed fabrication drawings for access structures for a gas facility in Western QLD. The access structures were designed for compliance with[…]

Grit Classifier Renewal

Client: TEW Solutions Project: Design and Drafting of Grit Classifier Renewal Date: 11/2018             Time to Completion:  7 Months Project Description: Ferrier Engineering was engaged by TEW solutions to provide design and detail fabrication drawings for the upgrade of the capture and screenings handling equipment for a large sewerage treatment plant in Northern Brisbane.[…]

STP Inlet Works Upgrade

Client: TEW Solutions Project: Design and Drafting of Inlet Works Upgrade Date: 11/2018             Time to Completion:  9 Months Project Description: Ferrier Engineering was engaged by TEW solutions to provide design and detail fabrication drawings for the upgrade of the capture and screenings handling equipment for a large sewerage treatment plant on[…]

Elevated Reservoir Telecommunications Support Structure

Client: Pensar Infrastructure Project: Elevated Reservoir Telecommunication Support Structure Date: 10/2018             Time to Completion:  5 Months Project Description: Ferrier Engineering was engaged by Pensar to design a new support structure and associated access and handrail structures for telecommunication equipment on the roof of an elevated water reservoir in South Brisbane. Scope of Works:[…]

Laser Scanning of Grain Handling Facility

Client: Kotzur Bulk Solids Handling Project: Laser Scanning of a Silo Facility Outside Emerald Date:  06/2018             Time to Completion:  1 Week Deliverables: 3D scan of an existing silo facility to allow the accurate installation of upgrade equipment. Description: Ferrier Engineering was engaged by Kotzur to laser scan a silo installation to[…]

Laser Scanning, Design and Drafting of Compressor Skid Access Platforms

Client: Rayham Engineering Project: Design and drafting of access platforms and handrail for 2 compressor skids at a gas processing facility north of Roma, QLD. Date:  05/2018             Time to Completion:  3 weeks Deliverables: 3D scan of existing compressor platform and associated equipment. Supply of RPEQ design certificate and detailed fabrication drawings.[…]

Laser Scanning of North Stradbroke Island Pump Station

Client: Pensar Project: Laser Scanning of the North Stradbroke Pump Station Date: 03/2018             Time to Completion:  1 week Deliverables: Post-processed ‘point clouds’ of pump station and external pipe spools. Supplied in ‘.RCP’ and ‘.RCS’ format. Reports on scan data accuracy. Sub 2 mm maximum point error was achieved for both[…]