Grit Classifier Renewal

Client: TEW Solutions Project: Design and Drafting of Grit Classifier Renewal Date: 11/2018             Time to Completion:  7 Months Project Description: Ferrier Engineering was engaged by TEW solutions to provide design and detail fabrication drawings for the upgrade of the capture and screenings handling equipment for a large sewerage treatment plant in Northern Brisbane.[…]

Finite Element Analysis of Spray Rig Chassis

Client: JPC Engineering Project: Analysis of 5000 L Spray Rig Chassis Date: 03/2016             Time to Completion: 3 weeks Deliverables: Design report listing references, loading assumptions and results of a beam-element analysis (utilising SpaceGass software). Results interrogated to AS4600. Design certificate signed by Registered Professional Engineer of Queensland (RPEQ). Description: Ferrier Engineering was engaged[…]

Posted in FEA